DEVITA provided Campus Critical Infrastructure Renovations which included:
Requirements for campus generator power distribution to Ambulatory Care, Data Center, and Same Day Surgery Center.
Campus Data Center back up power and UPS system
Data Center infrastructure design, including fire suppression and grounding grid
Coordination of services to minimize disruption of 24-hour facility
Developed night/day installation strategies for new UPS and generator power connections
Completed facility survey and plans for generator power distribution modifications and separation of loads into the data center, life safety, and critical care
Completed construction administration and owner’s representation throughout the contraction phase